My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-23_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-11-23_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:11 PM
Creation date
11/24/2009 10:07:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
11/23/2009
Doc Name
Preliminary Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR82
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
location of the topsoil replacement, and a description of the depth of topsoil that <br />will be replaced (the replacement zones, as discussed in question 1 above). These <br />annual plans may be included in a new appendix titled "Annual Topsoil <br />Replacement Plan ". If major changes are proposed to the topsoil replacement <br />plan, a Technical Revision will be required. Please add this commitment, where <br />appropriate, to the narrative on Pages 2.05 -46 through 2.05 -50. <br />8. On the top of Page 2.05 -48 Colowyo states that "...topsoil will be left in a rough <br />condition..." Please provide additional detail regarding the methods that will be <br />used to ensure that the topsoil is either left in a roughened state or roughened prior <br />to seeding. This practice is especially important in light of the fact that scrapers <br />are used for topsoil replacement at the Colowyo Mine, since scrapers contribute a <br />great deal of compaction to the topsoil. <br />9. Although variable topsoil replacement for the West Pit and South Taylor Pit is the <br />primary focus of TR -82, there is no mention of the topsoil replacement activities <br />in the East Pit, the Gossard Loadout or the facilities area. It is assumed that since <br />these areas are not specifically mentioned in the text that the topsoil in these areas <br />will be replaced in a uniform depth of eight inches, as approved in Technical <br />Revision 62. Please include a discussion of the topsoil replacement depth(s) and <br />method(s) that will be used in the East Pit, Gossard Loadout and facilities area <br />reclamation. <br />10. The final sentence on Page 2.05 -46, carrying over to Page 2.05 -47, which states <br />" Colowyo is moving entirely away from applying topsoil in uniform layers... ", <br />appears to be contradictory, depending on the response to question 9 above. <br />Please review the topsoil replacement on all areas of the mine site and correct the <br />above referenced statement if necessary. <br />This completes the preliminary adequacy review for Technical Revision 82. The <br />Division's proposed decision date is 12 December 2009. Colowyo's prompt response to <br />the above questions will help in proposing a decision by this date. Please call me at <br />(303)866 -3567 X8145 if you have any questions. <br />Sincerely, <br />James R. Staii ... .. . <br />Environmental Protection Specialist <br />cc: Sandy Brown; CDRMS <br />Tay Tonozzi; CCC <br />
The URL can be used to link to this page
Your browser does not support the video tag.