Laserfiche WebLink
sheet 1 of 2 <br />Date <br />User <br />10/22/2009 <br />MAC <br />County Weld <br />Site Kurtz Resource Recovery <br />Permit or other job action : Bond Estimate <br />Task description Replacing Topsoil Tract A <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />IFniiinment Description <br />Truck/loader team -Truck :Cat <br />-Loader: <br />773D (2002) <br />CAT 5090B <br />Support equipment -Load area <br />-Dump area : <br />NA <br />Cat D6R - 6S (2003) <br />Road maintenance -Motor grader <br />-Water truck <br />CAT 14H <br />Water Tanker, 3,500 Gal. <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />shovel <br />NA <br />dozer <br />grader <br />misctruk <br />% Utilization- machine : <br />100 <br />96 <br />NA <br />100 <br />50 <br />50 <br />- Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour : <br />$63.47 <br />$85.96 <br />NA <br />$24.86 <br />$41.68 <br />$11.98 <br />Operating cost/hour : <br />$94.98 <br />$151.96 <br />NA <br />$40.27 <br />$24.30 <br />$12.16 <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />NA <br />Operator cost/hour : <br />$25.88 <br />$38.72 <br />NA <br />$38.54 <br />$38.91 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$184.33 <br />$276.64 <br />NA <br />$103.66 <br />$104.89 <br />$62.83 <br />2 <br />1 <br />0 <br />1 <br />1 <br />1 1 <br />Group subtotals :1 <br />Work: $645.30 <br />Support : $103.66 <br />Maintenance : $167.72 <br />Abbreviation : none <br />Filename :M006 -005 <br />Material weight : 1,600 pounds /LCY Struck volume : <br />Descr.: Top Soil Heaped volume: <br />Rated payload : 108,060 pounds Average volume: <br />Payload capacity : 67.54 LCY Adjusted volume': <br />Final truck volume based on number of loader passes : <br />Loadina Tool Caoaci <br />Rated capacity (nom. heaped) <br />Descr.: Clay; Earth (100 <br />Bucket fill factor <br />Adjusted bucket capacity <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />45.90 LCY <br />38.44 LCY <br />truck volume adjusted to not exceed <br />rated payload or heaped volume <br />Job Conditio Corrections : <br />Site altitude (ft.) : <br />4,800 <br />7.500 LCY <br />Truck <br />Loader <br />Source <br />1059/.) <br />Altitude adj.: 1.000 <br />1.000 <br />(Cat HB <br />1.025 <br />Job efficiency: <br />0.830 <br />0.830 <br />(1 shif Ida <br />Net correction : <br />0.830 <br />0.830 <br />7.687 LCY <br />