Laserfiche WebLink
CIRCIES Cost Estimating Software <br />PUMPING WORK <br />PROJECT IDENTIFICATION <br />Task no. : 001 State Colorado Permit/job no.: M-1999-006 <br />Date <br />User <br />1012312009 <br />MAC <br />County: Weld <br />Site Kurtz Resource Recovery <br />Abbreviation :none <br />Agency ur organization name Colorado Division Of Reclamation, Mining And Safety <br />Permit cv other job action : Bond Estimate <br />Task description: Dewatering Wash Plant Wate <br />HOURLY EQUIPMENT COST <br />I <br />Description Quantity <br />Data <br />Sourc <br />Pump <br />Submersible pump - 460v, 8 in. <br />I <br />(CRG) <br />Suction hose: <br />NA <br />0 <br />NA <br />Discharge hose:Discharge <br />pipe - 10 in. D., 25 ft. <br />2 <br />(CRG) <br />Y6 <br />Horsepower: <br />05 <br />Operator cost/hour: <br />Cost Breakdown: <br />Job Utilization <br />Ownomhipouot/hour: <br />$5.60 <br />NA <br />Jobuhiftbosis <br />Operating cnxt/hour: ---------- ' <br />100 <br />Y6 <br />Horsepower: <br />05 <br />Operator cost/hour: <br />$2541 <br />NA <br />Weight (UST) <br />0.70 <br />Toto|coot/hour: <br />$43.00 <br />Total fleet cost/hour <br />$43.09 <br />PUMPING QUANTITIES <br />Initial pond <br />Conversion <br />Final pond <br />volume: 836,355.00 <br />cubic feet <br />factor <br />74805 volume: <br />6.256,354 <br />goUuno <br />Total pond inflow surface <br />Unit inflow rate in Total pond inflow <br />volume <br />area : 46 — sq. <br />ft. <br />gph/sq. ft. <br />0.3510 perhuur: <br />16 <br />gph <br />Source of volume estimate: <br />Revised Mining Pla <br />PUMPING TIME <br />Maximum pump capacity: <br />95 <br />----------'feet <br />gph/pump <br />Adjusted pumping capacity <br />154 <br />gph <br />Estimated suction head <br />Initial unadjusted pumping time <br />40.57 <br />hours <br />Estimated discharge head <br />-----------feet <br />-----------foot <br />Inflow during initial pumping <br />056,211 <br />gallons <br />Total head <br />Net unadjusted pumping time <br />44.83 <br />hours <br />CPBpumpoapooity: <br />— ----------- <br />Altitude adjustment factor: <br />1.0000 <br />(VA-o/oxbic) <br />Sitea|htude: <br />-----------foet <br />Pump efficiency factor: <br />1.0900 <br />(55/n/n.1hr) <br />Inflow 00%of pond volume: <br />N4 <br />% <br />| Total adjusted pumping time <br />48.00 <br />hours <br />JOB TIME AND COST <br />Total job time <br />48.90 <br />hours <br />Unit cost : <br />$0,000311 <br />per gallon <br />Total job cost <br />$2,151 <br />