Site Gearing is performed immediatety prior to sail removal in a given area. Clearing includes removal of • <br />woody or other matedals which could interfere with soil removal, or potentially contaminate soil. Site <br />Gearing and soil salvage operations are typically conduced from May to November. These activities maybe <br />conducted in other months if weather conditions permit. <br />BaGcfilling and grading activities are performed throughout the year. <br />Soil redistribution and associated graded spoil suitability determinations follow the same timetable as <br />salvage operations. if ground conditions permit, soil redistribution may be conducted in months other than <br />the primary months indicated in the reclamation timetable (Figure 13-1). Tillage and seetlbed preparation <br />(when necessary), cover cropping, and seeding of resoiled areas is cenduded in the next favorable planting <br />season after soil redistribution, weather permitting. Therefore, the schetlule for these activities may parallel <br />the soil redistdbution schedule in many pres. Tree and shrub planting is performed in the fall as tlortnant <br />plantings, but may be planted in spring on occasion. Tree and shrub planting areas are prepared during <br />spring, summer, and tali. <br />Fence construction is generally performed from April to November. Construction is interrupted only by <br />inclement weather or snowpadr. • <br />Maintenance and management activities are conducted throughout the year, weather and snowpaGc <br />conditions permitting. The timing of these activities is dependent upon the specfic activity. Fence <br />maintenance and removal of any trespass IivestoGc are generally conducted from mid-spring through fall. <br />Interseeding and any necessary reseeding is conducted in the next favorable planting season following the <br />decision to interseed or reseed. Erosion monitoring is conducted after snowmelt and heavy rains, with any <br />required repairs prried out from late spring through fall. Occasionally, the operations outlined above will be <br />completed during winter months when mild weather persists. Under normal conditions, the schedules are as <br />presented. <br />Proiected Reclamation Schedules. The projected baGfilling and grading schedule for the remaining Senep <br />II life-of-mine is presented on F~ibk 13.2. <br />The annual projection of areas graded as presented on Exhibit 13-2 is based upon certain basic <br />consitlerations. First, the baddilling and grading schedule is based upon the operation plan, coal expvation <br />cyGe times, and pit configuration. • <br />13-30 Revised 72/01/93 <br />