Laserfiche WebLink
Table 3.7-1 Page 31 <br />I ~ '! <br />ROADABLE EQUIPMENT ~~ sheet 2 of~2~ <br />Nearest major dty or town within projed area region <br />•l Transportation Cvde Time : Non- Total one-way travel distance <br />ll Roadable Roadable Average travel speed <br />Haul time (hours) = 0.88 0.88 Total non-roadable mob/demob cost' <br />Return time (hours) = 0.88 0.88 • two round trips with Haul rig <br />Loading lime (hours) = 0.25 NA Total roadable mob/demob cost " <br />Unloading time (hours) = 0.25 NA •• one round trip, no haul rig <br />Subtotals = 2.25 1.75 <br />JOB TIME AND COST <br />Total job time <br />Total job cost <br />Grand Junction <br />35.0 miles <br />40.0 mph <br />$1,243.89 <br />$155.34 <br />4.50 hours <br /> <br />EQUIPMENT HAUL DISTANCE and TIME <br />