Laserfiche WebLink
Table 3.7-1 Page 30 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Task # : 025 State :Colorado PermiUob # : C-1980-004 <br />Date : 1228!2005 County :Gafield Abbreviation :none <br />User : JRS Site : Mcclane Canyon Mine Filename :0004-025 <br />Permit or otherjob action :Permit Renewa106 <br />Task description : Mobilize/Demobilize <br />for Pond Removal <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (257, 507, and 1007) <br /> Available rig capacities 6-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour . $23.32 $25.78 $31.45 <br /> Operating cosUhour : $30.29 $31.74 $35.14 <br /> OperatorcosUhour: $27.40 $27.40 $27.40 <br /> Helper wsUhour : $0.00 $25.15 $25.15 <br /> Total Unit CosUhour : $81.01 $110.07 $119.13 <br />Machine Weight/unit Ownership Haul Rig Fleet Size Haul Trip Retum Trip DOT permit <br />Description (tons) Cost/hr/unit CosUhr/unit (No. units) Cost/hr/fleet Cost/hrHleet CosUfleet <br />-Cat D8R Series ll - 8SU 52.55 $48.82 $119.13 1 $167.95 $119.13 $0.00 <br />-Reveq Equipment 20.00 $76.00 $81.01 1 $157.01 $81.01 $0.00 <br />Subtotals :~ $324.96 ~ $200.14 ~ $0.00 <br />