My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-20_PERMIT FILE - C1980004A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2009-10-20_PERMIT FILE - C1980004A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:19 PM
Creation date
11/10/2009 10:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
10/20/2009
Section_Exhibit Name
Tables 2.1-1 to 4.1-5
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3.7-1 Page 15 <br />PROJECT IDENTIFICATION <br />Task # : 013 <br />Date : 1228/2005 <br />User : JRS <br />CIRCES Cost Estimatin4 Software <br />State :Colorado <br />County : Ga~eld <br />Site :Mcclane Canyon Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Permit Renewal 06 <br />Task description <br />HOURLY EQUIPMENT COST <br />Horsepower: 162 <br />Weight (MT) : 24.19 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $27.86 NA Shift basis : 1 per day <br />Operating cost/hour : $33.01 100 Data source : (CRG) <br />Operator cosUhour : $31.97 NA <br />Total unit cosUhour : $92.84 Total fleet cost/hour : $92.84 <br /> <br />MATERIAL QUANTITIES ,:. . <br />Initial Swell Loose <br />volume : 175 BCY factor : 1.330 volume : 233 LCY <br />Source of estimated volume :Figure 2.2-3 <br />Source of estimated swell factor :CAT Handbook <br />.< :. ,:. <br />HOURLY PRODUCTION <br />Excavator CvGe Time (load bucket swino loaded dumb bucket. swing emDNl <br />Basic job condition description : BELOW AVERAGE <br />Secondary job condition within basic desuiption : AVERAGE <br />Cycle time value : 0.34 minutes <br />~J <br />Bucket Caoacity <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />Diversion Ditches <br />Machine description :Cat 322C L <br />1.44 LCY (heaped) <br />0.97 Sand and gravel (95Yo - <br />1.40 LCY <br />Permitlob # : C-1980-004 <br />Abbreviation :none <br />Filename :0004-013 <br />Bucket size class : medium <br />Job Condition Correction Factors Source <br />Site altitude : 5,600 feet Altitude adjustment : 1.00 I (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br />Unadjusted houdy unit production : 251.46 LCY/hour <br />Adjusted houdy unit production : 208.71 LCY/hour <br />Adjusted hourly fleet production : 208.71 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Total job time <br />1.12 hours <br />Unit cost : $0.445 per LCY Total job cost : $104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.