Laserfiche WebLink
Table 3.7-1 Page 14 <br />CIRCES Cost Estimation Software <br />~J <br />PROJECT IDENTIFICATION <br />Task # : 012 <br />Date : 12P182005 <br />User: JRS <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />PennR or other job action :Permit Renewal O6 <br />Task description : Bacl~ll and Regrade Sediment Pond, <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 4, 750 <br />State :Colorado PermiUjob# : C-1980-004 <br />County : Ga~eld Abbreviation :none <br />Site : Mcclane Canyon Mine Filename :0004-012 <br />Basic machine :CatDBR Series ll <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cosUhour <br />Operating cosf/hour <br />Ripper op. cost/haur <br />Operator cosUhour <br />Total unit cosUhour <br />Swell <br />CCY factor <br />8SU <br />Utilization <br />$U <br />Loose <br />1.165 volume: 5,534 LCY <br />$48.82 NA <br />$66.09 100 <br />$0.00 0 <br />$31.78 NA <br />$146.70 Total fleet cost/hour <br />Source of estimated volume :Figure 2-2-2 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (I <br />Average site altitude : 5,600 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock- 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.484 /LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shiff/day <br />Spoil pile : 0.80 (fid-rfJ <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SUAI) <br />Net correction : 0.36 <br /> <br />Adjusted unit production : 302.96 LCY/hr <br />Adjusted fleet production : 302.96 LCY/hr <br />Total lob time : 18.27 Hours <br />Total job cost : $2,679 <br />