Laserfiche WebLink
2.05.3(31 <br />• (31 Mine Facilities <br />(a) The mine facilities required for this operation <br />are very limited. It is expected that a fuel tank and two 40- <br />foot long enclosed semi-trailers will be the extent of the mine <br />facilities. The location of these facilities is shown on the <br />Mine Plan Map, Drawing No. 115. A further description of the <br />facilities follows: <br />Repair Shop, Office Facilities <br />The repair shop and office facilities will be <br />constructed using one or two 40-foot long enclosed semi-trailers. <br />If two trailers are used they may be parked side by side, about <br />ten feet apart, so a roof may be constructed between them to <br />provide additional covered work space. The tires and wheels will <br />be left on the semi-trailers. Electrical power for the shop and <br />office complex, if necessary, will be provided by a portable <br />generator. <br />Fuel Tank <br />An above ground steel tank with up to a 30,000 <br />gallon capacity. The tank will be bermed in accordance with <br />applicable regulations. <br />• Sanitary Facilities <br />Portable sanitary facilities will be provided near <br />the active mining area and in the area of the shop and office <br />complex. <br />(b) Not applicable. There are no structures on site <br />for which there are specific design criteria or performance <br />standards specified in the Rules. <br />„r~t <br />U~ y-~~ <br />2.05-5 May 1991 <br />