Laserfiche WebLink
Worst case reclamation costs for this scenario are shown in Table L-1: <br />Table L-1 Reclamation Task and Cost Estimate <br />Activity Description Time (Months) Cost ($) <br />Remove all buildings, tanks, scales, and ashpalt plant 0.2 $3,000 <br />Move overburden 400 ft at an relativly flat grade from <br />stockpiles to the Center Pivot Field using Cat D-8 <br />dozer 133,333 cy @ $0.33/cy <br />1 <br />$44,000 <br /> <br />Regrade 1H: 1V side slopes to 2H: IV 1250 sq.ft per <br />length at 1388' using Cat D-8 dozer $0.33 cy <br />0.30 <br />$21,206 <br />Move overburden 2500 feet with a 637 scraper from <br />disturbed area in Mining Area 2 to the Center Pivot <br />Field 133,333 cy $0.87/cy <br />1.00 <br />$116,000 <br /> <br />Regrade Center Pivot Area to l OH: IV using Cat D-8 <br />dozer 40,000 cy @ $0.33 cy <br />0.30 <br />$13,200 <br />Bring topsoil from stockpile, Place topsoil on pit floor <br />at 4" depth, spread and final grade @$0.87 cy. @ <br />48,000 cy <br />0.30 <br />$41,760 <br /> <br />Disc irrigated pasture area prior to seeding @ <br />$200/acre x 55 acres 0.30 $11,000 <br />Seed the irrigated pasture area. Drill seeding will be <br />employed @ $1100/acre x 55 acres. 0.10 $49,500 <br /> <br />Seed, mulch and fertilize rangeland areas. broadcast <br />seeding and mulching will be employed @ $1100/acre <br />x 9 acres. <br />0.25 <br />$99900 <br />Totals 3.75 $309,565 <br />DRMS Costs (21% x direct costs) $65,009 <br />Total Bond Amount $374,574 <br />Cugnini Pit, November 2009 L-2