My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-19_PERMIT FILE - M2009054 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009054
>
2009-10-19_PERMIT FILE - M2009054 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:17 PM
Creation date
10/20/2009 1:10:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009054
IBM Index Class Name
PERMIT FILE
Doc Date
10/19/2009
Doc Name
Answers to Adequacy Review #2
From
Banks and Gesso, LLC
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Banks and Gesso, LLC <br />Exhibit E - Reclamation Plan <br />Overview <br />The post-mining use of the Proctor Pit will be rangeland. Reclamation calls for <br />stabilization and cover of disturbed areas in accordance with standards that will <br />accommodate the proposed post-mining use. The permit area will be reclaimed using <br />concurrent reclamation techniques. <br />Reclamation Process <br />Reclamation will consist of establishment of slopes, re-spreading of soil, seeding, and <br />management prior to release. Maximum slopes will accommodate.cattle movement. <br />The 45.5 acres of seeded ground will be incorporated into the open range of the owner's <br />property. <br />Due to the intermittent nature of the mining, only estimates for the timing of the <br />reclamation are given. The mining will progress to the south and east from the original <br />disturbances. Generally, an area will be reclaimed when all the resource is removed <br />and the mining face has moved to the limit of mining. Parts of the pit floor will be <br />reclaimed when they are longer needed for circulation or the gravel processing plant. <br />The operator expects that reclamation will be performed in three to five year intervals. <br />The existing disturbed area is the exception to this general rule, as this area will serve as <br />the initial gravel processing plant site for mining. Therefore this area.will be the last to <br />be reclaimed concurrently with the southern sections of the pit. The access road will be <br />reclaimed at the end also. <br />Estimated Reclamation Schedule <br /> Mining (Years from Active Reclamation <br />Phase commencement of operations) (Years from <br /> commencement <br />111 <br />Permit Complete 16 - 18 <br />New 1 to 15 4 to 18 <br />All-Rite Paving & Redi-Mix, Inc. 09002 <br />Proctor Pit 10 July, 2009
The URL can be used to link to this page
Your browser does not support the video tag.