My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-15_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-10-15_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
10/16/2009 12:57:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/15/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: 9/27/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth 8 Environmental <br />H) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material resumed at the South Cresson Clay Process. A CAT D-6 <br />dozer, a CAT 330 excavator, and a CAT 966 front-end loader were used to process the <br />material. <br />Location This Week <br />tons Cumulative Comments <br />So Cresson Clay Processing 9,005 93,553 <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 9,005 129,369 <br />I) New ADR Water Tank and Waterline <br />New Crusher waterline trench excavation continued using a CAT 330 excavator. Pipe bedding and <br />HDPE pipe were placed in the trench using a CAT 966 front-end loader. <br />J) Miscellaneous <br />Removal of the old solution lines continued by cutting the welds in the lines using an <br />oxy/acetylene cutting torch. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial during the week. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />VLF Weekly Report WE 10.03.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.