Laserfiche WebLink
amec <br />Earth & Environmental <br />E) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations A27+00 (+/-) and A30+00 (+/-), <br />approximately 150 to 250 feet right of centerline and between stations J5+00 (+/-) and J9+00 <br />(+/-) 0 to 300 feet right of centerline. Contouring was performed using various CAT dozers. <br />Material generated as the cut progressed was pushed down the slope. <br />F) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road between stations A28+00 (+/-) to <br />A36+00 (+/-). <br />G) Cut to Fill <br />1) VLF <br />A John Deere 850 excavator, a CAT 375 excavator, and a CAT 385 excavator excavated <br />structural fill material from between stations H13+00 (+/-) and H30+00 (+/-), approximately <br />30 to 250 left of centerline. The structural fill material was loaded into CAT 777 haul trucks. <br />Prior to structural fill placement, during periods of time when ambient temperatures were <br />below 32°F, fill areas were prepared and worked to bring the existing fill to or above 36°F. <br />Ambient and fill temperatures were monitored on an hourly basis, by an AMEC representative. <br />Fill temperatures averaged approximately 43°F during the period of time the ambient <br />temperature was below 32°F. <br />Structural fill material was placed in the following areas: between stations A0+00 (+/-); A2+00 <br />(+/-); E20+00 (+/-); and E23+50 (+/-), approximately 0 to 75 feet left of the "E" centerline; <br />between stations A40+00 (+/-) and A44+50 (+/-), approximately 25 to 75 feet right of <br />centerline; between stations A51+00 (+/-) and A58+00 (+/-), approximately 75 to 150 feet <br />right of centerline; between stations J8+00 (+/-) and J13+00 (+/-), approximately 150 to 200 <br />feet right of centerline; and between stations K4+50 (+/-) and K10+00 (+/-), approximately 50 <br />to 100 feet right of centerline. The structural fill material was spread using various CAT dozers <br />in 18" to 24" lifts. Each lift was moisture conditioned using a CAT 773 water truck (when <br />necessary) and compacted using a 10-ton vibratory smooth drum compactor, passing over the <br />entire fill surface at least 4 times (method compaction technique is applicable). <br />Blast pattern drilling was performed between stations A6+00 (+/-) and A8+50 (+/-), <br />approximately 50 feet left of centerline to 30 feet right of centerline and between stations <br />J26+00 (+/-) and J27+50 (+/-), approximately 0 to 50 feet right of centerline using two track <br />mounted drill rigs. Blasting was performed in this area on Thursday (10/1/2009). <br />Structural fill material (processed ore) was pushed toward the southeast corner Phase IV VLF <br />to be placed as fill later. This was performed using a CAT D-8 dozer. <br />VLF Weekly Report WE 10.03.09.D.doc