Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or or( <br />Task 010 <br />Date : 0912412009 <br />User : JHB <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />lanization name : Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job #: C-1981-028 <br />County : Weld Abbreviation :none <br />Site: Keenesburg Strip Mine Filename :C028-010 <br />Permit or other job action : S14 <br />Task description :haul 102,450 cu yd of topsoil to spoil pile site <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Cost Bre <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :Cat D9R - 9SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 3,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA grader misctruk <br />% Utilization-machine : 100 NA 25 NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $108.62 NA $58.86 NA $41.72 $11.29 <br />Operating cost/hour : $230.60 NA $31.51 NA $15.30 $9.03 <br />Ripper op. cost/hour : NA NA $0.00 NA $0.00 NA <br />Operator cost/hour : $38.72 NA $38.54 NA $38.91 $38.70 <br />Unit subtotals : $377.93 NA $128.90 NA $95.92 $59.02 <br />Number of units : 4 0 1 0 1 1 <br />Group subtotals : Work : $1,511.74 Support: $128.90 Maintenance : $154.94 <br />Total work team cost/hour : $1,795.58 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 102,450 CCY factor : 1.060 volume : 108,597 LCY <br />Source of quantity take-off :2003 ARR map <br />Source of estimated swell factor : program