My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-13_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2009-10-13_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:09 PM
Creation date
10/14/2009 9:47:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
REVISION
Doc Date
10/13/2009
Doc Name
Review Letter & Cost Estimate
From
DRMS
To
Coors Energy Company
Type & Sequence
SR1
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 009 <br />Date : 0912512009 <br />User: JHB <br />Permit/job # : C1981-028 <br />Abbreviation :none <br />Filename : C028-009 <br />Agency or organization name: Division Of Reclamation, Mining And Safety <br />Permit or other job action : SL4 <br />Task description :final grade 50.8 acre excess spoil area <br />HOURLY EQUIPMENT COST <br />Basic machine : CAT 14H <br />Horsepower <br />7-1 K <br />Attachment no. 1 : NA Shift basis : 1 per day <br />Attachment no. 2 : Multi-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown Ownership cost/hour : $45.35 NA <br />Grader operating cost/hour : $61.19 100 <br />Ripper operating cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $145.08 Total fleet cost/hour : $145.08 <br />MATERIAL QUANTITIES <br />Total area to be graded or tipped : 50.80 acres <br />Source of estimated acreage :2008 ARR <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees ' • at 0 degrees, blade is perpendicular <br />Effective blade length : 12.10 feet to direction of travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet'* ?• width of ripper beam on ripping applicati ons <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 5,000 feet Altitude adjustment factor : 1.00 I (Cat HB) <br /> Job efficiency adjustment factor : 0.90 (1sh1d, fav.) <br /> Net job correction : 0.9000 multiplier <br /> <br />Adjusted hourly unit production : 1.3773 acres/hour <br />Adjusted hourly fleet production : 1,3773 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 36.88 hours <br />Unit cost : $105.34 per acre Total job cost : $5,351 <br /> <br />CIRCES Cost Estimatina Software <br />MOTOR GRADER WORK <br />State : Colorado <br />County :Weld <br />Site :Keenesburo StriD Mine
The URL can be used to link to this page
Your browser does not support the video tag.