Laserfiche WebLink
Support Facilities <br /> The operator is has recently completed installation of a rail hoist at the East Portal. Grading, <br /> installation of track, and installation of a diesel-powered hoist and cabling system is now <br /> complete. <br /> Portal <br /> Hoist and power Rail car <br /> r <br /> wSl .p <br /> Topsoil <br /> The operator has graded, <br /> seeded and mulched, and <br /> established a topsoil marker <br /> on the topsoil pile within the <br /> topsoil borrow area at the <br /> West mine, shown at right. <br /> Fish and Wildlife <br /> A group of about ten turkeys <br /> were observed using the <br /> reclaimed area of the former <br /> coal stockpile east of the <br /> office. <br /> 4 <br />