Laserfiche WebLink
Rimrock Exploration & Development, Inc. <br />J-Bird Uranium Mine/ DMO/ EPP Disposal of Tailings and Sludges in Mine Workings <br />19.0 DISPOSAL OF TAILINGS AND SLUDGES IN MINE WORKINGS <br />No processing of any kind will occur on-site. There will be no sludge produced. All ore <br />will be shipped off-site. After mine life, prior to adit fill-in and portal closure, a radiation <br />survey will be completed to determine if above back-ground locations exist. These <br />locations will be scraped and surface material removed to assure topsoiling will reduce <br />ambient activity. The removed surface material will be placed in the stoped areas near <br />back of mine adit. <br />Compliance with Rule 3.1.7 - Groundwater and associated subsections is not a concern. <br />Referencing recent exploration drilling and current mining activity, groundwater does not <br />occur at the site in any measurable amount. <br />30