Laserfiche WebLink
Rimrock Exploration & Development, Inc. <br />J-Bird Uranium Mine <br />Exhibit C <br />Amendment Application <br />6.3.3 <br />Exhibit C <br />Mining Plan: <br />1. Description of Mining Plan: <br />a) Mining is expected to commence following Division of Reclamation Mining and Safety <br />approval of this amendment application, posting of any re-calculated bond and weather <br />dependent. Ore reserves indicate, mining will end 10-15 years thereafter. <br />b) Plant growth medium, please refer to original reclamation application from Rimrock <br />dated 06/11/05 Exhibit C. Locations are noted in Exhibit E of this amendment <br />application and further information is presented in Exhibit T/ EPP Section 17 of this <br />amendment application. <br />c) For description of overburden quantity, refer to original application dated 06/11/05 <br />Exhibit C and location indicated on the revised Exhibit E- Site Map. <br />d) Thickness of deposit, please refer to original reclamation application dated 6/11/05 <br />Exhibit C. <br />e) Roads and access routes, pit, and ventilation facility, are same as original reclamation <br />application dated 06/11/05. Location of the adit has changed as indicated on the attached <br />cover letter and revised Exhibit E-Map. Office is a small mobile trailer, maintenance <br />buildings are shipping containers. Also reference more information letter dated 07/02/05 <br />and adequacy issues response letter dated 10/07/05 (attached). <br />f) Dimensions of significant disturbance are approximate and illustrated in the revised <br />Exhibit E- Map. Stormwater control structures are located in Exhibit T/ EPP Figures 4a <br />and b. Please refer to provided legend for scale. Additional information is provided in <br />the original reclamation application dated 06/11/05 Exhibit C. Also reference more <br />information letter dated 07/02/05 and adequacy issues response letter dated 10/07/05 <br />(attached).