Laserfiche WebLink
Colowyo C-1981-019 <br /> 16 Sept 2009 <br /> Pg 4/5 <br /> - Colowyo has replaced topsoil in most of the East Taylor reclamation block <br /> (approximately 50 of the 55 acres). They were working on replacing the remaining <br /> topsoil at the time of the inspection. The topsoil was hauled by trucks, dumped and <br /> spread with dozers and hauled and spread by scrapers. The use of scrapers has <br /> caused considerable compaction to much of the north area of the reclamation <br /> block. Although Colowyo has done some limited ripping, additional measures need <br /> to be taken to alleviate the compaction of the topsoil caused by the scrapers. In <br /> addition to alleviating compaction, ripping and roughening the surface will decrease <br /> the amount of erosion that will result in this area. The two lower slopes (northern-most <br /> and closest to the East Taylor Pond) are very steep and will need some means of <br /> helping control runoff/erosion. The Division dug eight holes to verify the replacement <br /> depth of the topsoil in the West Pit. The following chart shows the locations of the <br /> holes and the topsoil depths. Currently, the average topsoil replacement depth for <br /> topsoil is 8 inches. Based on the eight test holes, Colowyo has replaced an average <br /> of 8.9 inches of topsoil in this portion of the West Pit. *Please see the picture/map at <br /> the end of this report for topsoil test hole locations* <br /> Depth <br /> Location Eastine Northing in. <br /> WP-TS1-8" 259098.869 4460205.430 8 <br /> WP-TS2-8" 259077.477 4460261.820 8 <br /> W P-TS3- 11" 259158.017 4460464.466 11 <br /> WP-TS4-7" 258920.538 4459987.484 7 <br /> WP-TS5-9" 258875.863 4460141.908 9 <br /> WP-TS6- 10" 258986.477 4460414.106 10 <br /> WP-TS7-7" 258959.781 4460258.791 7 <br /> WP-TS8- 11" 258893.212 4459853.557 11 <br /> Average Depth 8.875 <br /> General Mine Plan Compliance: - The 101 dragline was in the West Pit uncovering X- <br /> Seam coal. It is not clear whether it will return to the East Pit to perform further <br /> reclamation. <br /> - The 102 dragline was down for a scheduled PM. <br /> - The 103 dragline was working in the West Pit removing E-Seam overburden. <br /> - The 114 shovel operation was in the South Taylor Pit box-cut removing B-1 <br /> overburden. <br /> - The 115 excavator was on the upper edge of the South Taylor Pit box-cut (west side) <br /> building a road for topsoil removal operations west of the current area (to complete <br /> the box-cut). *See Pictures at the end of this report* <br />