Laserfiche WebLink
Colowyo C-1981-019 <br /> 16 Sept 2009 <br /> Pg 3/5 e?�7 <br /> Backfilling and Grading (cont): - As noted in previous reports, there is a fairly large <br /> area in the older (2007-2008 vintage) reclamation that has developed a problem <br /> with rills and gullies. The general rill and gully area was walked with a GPS and was <br /> approximately 40 acres. It runs from bottom of the Prospect drainage area to the <br /> south edge of the 2007-2008 reclamation to the light-use road along the power lines <br /> to the light-use road on the north side of the reclamation block (see the attached <br /> map/picture for a detailed location). The gullying in this area is quite extensive and <br /> remedial measures will need to be taken to ensure the long-term stability of this area. <br /> Several of these gullies have breached the contour ditches cut into the reclamation. <br /> Although these ditches have been fixed, if the gullies are not repaired they will <br /> breach again and the gullies will get worse. In addition to the gullies, there were <br /> several large cracks noted in the reclamation in this area. Colowyo should survey this <br /> area for rills and gullies and cracks in the backfill and repair or monitor as necessary. <br /> *Please see the picture/map at the end of this report* <br /> Topsoil: - Colowyo has replaced topsoil to the entire 2009 reclamation block in the <br /> East Pit. The topsoil was brought to the area using haul trucks and spread with <br /> dozers. The replaced topsoil was tracked with a dozer to roughen the surface slightly <br /> but addition roughening, such as ripping, chisel plowing or discing, would be <br /> beneficial. Colowyo has cut contour ditches into the small area north of the <br /> Prospect Ditch and has indicated that contour ditches would be cut into the <br /> remaining area once the seeding is completed (in early October). The Division dug <br /> seven test holes to verify the topsoil depth in the 2009 reclamation block. The <br /> following chart shows the locations of the holes and the topsoil depths. Currently, the <br /> average topsoil replacement depth for topsoil is 8 inches. Based on the seven test <br /> holes, Colowyo has replaced an average of 9 inches of topsoil in this portion of the <br /> East Pit. *Please see the picture/map at the end of this report for topsoil test hole <br /> locations* <br /> Depth <br /> Location tasting Northing in. <br /> EP-TS1- 12" 261005.382 4457264.997 12 <br /> EP-TS2-7" 260982.020 4457152.213 7 <br /> EP-TS3-8" 261090.482 4457215.560 8 <br /> EP-TS4-9" 261216.867 4457366.787 9 <br /> EP-TS5-6" 261320.198 4457460.462 6 <br /> EP-TS6- 11" 261356.330 4457598.869 11 <br /> EP-TS7- 10" 261083.824 4457377.842 10 <br /> Average Depth 9 <br />