Laserfiche WebLink
J. J. Dudash -6- October 01, 2009 <br />structure detail should have been included. Please see structure detail for Ditch <br />F13 on page App B-24. F14 has been revised and the structure detail should <br />have been included. Please see structure detail for Ditch F14 on page App B- <br />25. F16 has been revised and the structure detail should have been included. <br />Please see structure detail for Ditch F16 on page App B-27. F17 has been <br />revised and the structure detail should have been included. Please see structure <br />detail for Ditch F17 on page App B-28. F18 has been revised and the structure <br />detail should have been included. Please see structure detail for Ditch F18 on <br />page App B-29. East Diversion Ditch has been revised and the structure detail <br />should have been included. Please see structure detail for the East Diversion <br />Ditch on page App B-32 and B32i West Diversion #1 has been revised and the <br />structure detail should have been included. Please see structure detail for the <br />West Diversion #1 Ditch on page App B-33 and B33i. Culvert F2 has been <br />revised and the structure detail should have been included. Please see structure <br />detail for Culvert F2 on page App B-31. <br />18. DRMS - Comparison of currently approved Map 15-3, Map 21-3, Figure 1 and <br />Figure 2 with the comparable maps and figures that are proposed in TR-64 <br />shows that the designation of the western flowing extension of West Diversion <br />Ditch #1 has been eliminated. Previous field inspections have indicated that the <br />West Diversion Ditch #1 had an eastern flowing component and a western <br />flowing component and that the western flowing component diverted undisturbed <br />runoff to the west, away from the western extent of the gob pile. Unless this <br />situation has changed in the field, please add this ditch designation back onto <br />these two maps and these two figures. <br />BRL - DRMS is correct, the Western portion of West Diversion Ditch #1 was <br />erroneously deleted and has been re-inserted into Map 15-3, Figure 1, 20, 21, <br />and Figure 2. <br />19. DRMS - The TR-64 submittal includes a proposed page Exh 8-20. However, the <br />Division's copy of the permit application for Exhibit 8 already has page Exh 8-20. <br />It appears that this proposed page should be Exh 8-19i. Please revise this page <br />number accordingly. <br />BRL - Exh 8-20 has been revised to now show page Exh 8-19i. <br />20. DRMS - In the table "V-Ditch Design" on proposed page Exh 8-29i, the peak <br />flows for ditches D5, D6, D7 and D8 do not correspond with the peak flows given <br />in the new ditch designs. Please revise accordingly. <br />BRL - Ditches D-5, 6, 7 & 8 have been updated on page Exh 8-29i. <br />21. DRMS - In the table "V-Ditch Design" on proposed page Exh 8-29i, the design <br />entries for ditch GVB7 have been removed. However, this ditch still appears on <br />Map 36B. Please add the GV137 information to the table or explain why the <br />information was removed.