My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-30_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2009-09-30_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:53 PM
Creation date
10/6/2009 8:32:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
9/30/2009
Doc Name
Review Memo
From
Mike Boulay
To
Marcia Talvitie
Type & Sequence
TR59
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maria Talvitie <br />?pte?nber 3a, X009 <br />Pale 2 <br />annually on alarriity Dxaw and west Lateral Ditch and annually on Tuttle Draw. <br />Monthly field parameters are collected at all five lacatians? Flow vaxiability in both <br />calamity Draw and Tuttle Draw axe largely influenced by ixrigatian from. about mid- <br />April to Enid-Dctaber. ?s stated by 'F in their revision application based ors data <br />collected franc the mine site, TD varies mare with respect to flaw than anything else. It <br />is reasonable to assume that potential impacts from mining would be best characterized <br />by sampling during nanMirrigatian season. Further, a determination of the probable <br />hydrolagac Consequences of the coal mining activity an e permit and add scent areas <br />with respect to hydralog?c regime ?s zequired under all seasonal cond?tlans. The <br />hydrologic ronitoring plan is developed based in part on the probable hydrologic <br />consequences. Therefore, the Division believes that sampling only once per year would <br />not provide adequate analyses of potential mining impacts clad would not adequately <br />characterize seasonal variations. <br />The D?vis?an w?11 require ?wFC to do semi-annual full suite laboratory analysis and semi^ <br />annual field analyses per the parameters listed an Table 2.04.72 for all five approved <br />surface water sites The scrupling should be conducted ante during the irrigation season <br />and once again in the non?irrigation season ever?r year. This will provide carne relief <br />from the monthly field monitoring as requested by wF?, but more importantly wi11 <br />provide a reasonable and consistent approach to the surface monitoring program. Please <br />revise and update the pertinent sections 2.04.7 in the permit appl?cat?on package <br />including Table 2.04.7- l . <br />Let me knave if you have questions or require additional inforatlan. <br />C; dandy Brawn
The URL can be used to link to this page
Your browser does not support the video tag.