4) . What are the plans for the removal of the old trailers and lots of no mine waste noted <br />during the site visit. Since the cost of removal of these item was. not included in your <br />Reclamation cost estimate, please include and update the cost estimate. Once we <br />receive the number of trailers that will still need to be moved and the estimate of other <br />none mine waste that will need to be either buried in the pit or haul off site, DRMS will <br />send you the RECLAMATION cost estimate. <br />Ill) Exhibit L Permanent Man Made Structures <br />You have listed five permanent manmade structures under the Exhibit, please provide the <br />agreement in lieu of an Engineering study for all the structures not owned by the operator. <br />The decision date for your application is October 21, 2009, please provide your response as <br />soon as possible. <br />Sincerely, <br />Berhan Keffelew <br />Environmental Protection Specialist.