My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-10-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:56 PM
Creation date
10/5/2009 3:37:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
10/1/2009
Doc Name
2009 Midterm Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 026 State :Colorado Permit/job #: C-1996-083 <br />Date : 0912812009 County : Delta Abbreviation : none _ <br />User : JRS Site: Bowie No. 2 Mine Filename :C083-026 <br />Permit or other job action : 2009 Midterm Review <br />Task description : Haul Material from Bowie No. 1 Mine Stockpile to Hubbard Creek Vent Sha <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck : Generic 10-12 cy, 6x4 <br />-Loader : CAT 950G (2002) <br />Support equipment -Load area : Cat D9R - 9SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer NA NA NA <br />% Utilization-machine : 100 34 50 NA NA NA <br />-Ripper attachment : NA NA 50 NA NA NA <br />Ownership cost/hour : $12.60 $22.32 $58.86 NA NA NA <br />Operating cost/hour : $60.25 $13.21 $59.97 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $22.29 $38.54 $38.54 NA NA NA <br />Unit subtotals : $95.14 $74.06 $157.36 NA NA NA <br />Number of units : 8 1 1 0 0 0 <br />Group subtotals : Work : $835.18 Support : $157.36 Maintenance : $0.00 <br />Total work team cost/hour : $992.54 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,000 CCY factor : 1.125 volume : 3,375 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis I Truck Bed (volume) Basis : <br />sheet 1 of 2 <br />Material weight : 2,900 pounds/LCY Struck volume <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume <br />Rated payload : 35,400 pounds Average volume <br />Payload capacity : 12.21 LCY Adjusted volume' <br /> Final truck volume based on number of loader passes <br /> truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : <br />Rated capacity (nom. heaped) : 3.750 LCY Truck <br />Descr.: Loose material - 1 "and over (85 - 90%) Altitude adj.: 1.000 <br />Bucket fill factor : 0.875 Job efficiency : 0.830 <br />Adjusted bucket capacity : 3.281 LCY Net correction : 0.830 <br /> <br />10.00 <br />12.00 <br />11.00 <br />12.00 <br />9.84 <br />Site altitude (ft.) <br />Loader <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />1.000 <br />0.830 <br />0.830 <br />6,500 <br />Source
The URL can be used to link to this page
Your browser does not support the video tag.