My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-10-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:56 PM
Creation date
10/5/2009 3:37:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
10/1/2009
Doc Name
2009 Midterm Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION permit/job # : C-1996-083 <br />Task #: 025 State :Colorado ------ - <br />Abbreviation :none <br />Date : 0912812009 County:Delta Filename :C083-025 <br />User : JRS - Site :Bowie No. 2 Minn --- <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2009 Midterm Review -- - <br />Task description :Regrade Upper Parking Lot Expansion Area <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 3658 L Series 11(2005) Horsepower : 404 <br />Weight (MT) : - - <br />Utilization % <br />Cost Breakdown : NA <br />Ownership cost/hour : $75.87 <br />Operating cost/hour : $135.77 - 100 <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $250.37 <br />MATERIAL QUANTITIES Loose <br />Initial Swell <br />volume : 1,500 BCY factor : 1.250 volume <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Shift basis : 1 per day. Data source : (CRG) <br />Total fleet cost/hour : $250.37 <br />1,875 LCY <br />Excavator Cvcle Time (load bucket swing loaded duma bucket swing empty) <br />Basic fob condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.57 minutes <br />Bucket Capacity <br /> <br />Rated bucket capacity : 6.90 LCY (heaped) <br />Bucket size class : <br />large <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) --- - - <br />Adjusted bucket capacity : 5.87 LCY <br /> Source <br />Job Condition Correction Factors <br />Altitude adjustment : <br />1.00 _ <br />_(Cat HB) <br />Site altitude : 6,900 feet Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 617.37 LCY/hour <br />Adjusted hourly unit production : 512.42_LCY/hour <br />Adjusted hourly fleet production : 512.42 LCY/hour <br />JOB TIME AND COST <br />1 excavator(s) <br />Total job time : <br />3.66 hours <br />Fleet size : <br />Unit cost : $0.489 per LCY Total job cost : $916
The URL can be used to link to this page
Your browser does not support the video tag.