My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-10-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:56 PM
Creation date
10/5/2009 3:37:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
10/1/2009
Doc Name
2009 Midterm Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 006 <br />Date : 0912812009 <br />User : JRS <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2009 Midterm Review ---- - - - - <br />Task description :Pull Back Material at Old Truck Loadout Material Storage Area <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 365B L Series 11(2005) <br />Cost Breakdown : Jtilization % <br />Ownership cost/hour : $75.87 NA <br />Operating cost/hour : $135.77 100 <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $250.37 <br />MATERIAL QUANTITIES <br />Swell Loose <br />Initial <br />volume : 9,790 CCY factor : 1.165 volume <br />Source of estimated volume: Page 3.02-2 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded dump bucket swing empty) <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.57 minutes <br />Bucket Capacity <br />Rated bucket capacity : 3.27 LCY (heaped) Bucket size class : <br />small <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 2.76 LCY <br /> Source <br />Job Condition Correction Factors <br />Altitude adjustment : 1.00 (Cat HB) <br />Site altitude : 6,500 feet <br />Job efficiency adjustment : 0.83 (1 shift/da_y) <br />Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 292.58 LCY/hour <br />Adjusted hourly unit production : 242.84 LCY/hour <br />Adjusted hourly fleet production : 485.68 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 2 excavator(s) Total job time : 23.48 hours <br />Unit cost : $1.031 per LCY Total job cost : $11,759 <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />State : Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Horsepower: 404 <br />Weight (MT) : 70.25 <br />Shift basis : 1 per day_ <br />Data source : (CRG) <br />Total fleet cost/hour : $500.73 <br />11,405 LCY <br />Permit/job # : C-96-083 <br />Abbreviation :none <br />Filename :C083-006
The URL can be used to link to this page
Your browser does not support the video tag.