Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 005 State : Colorado Permit/job# : C-96-083 <br />Date : 0912812009 County :Delta Abbreviation :none User: JRS Site :Bowie No. 2 Mine Filename :C083-005 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2009 Midterm Review <br />Task description :Rip and Regrade Material Storage Area at Gob Pile <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : _ _(CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $92.20 NA <br />Operating cost/hour : $164.67 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $295.41 Total fleet cost/hour : $1,181.65 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,630 CCY factor : 1.165 volume : 4,229 LCY <br />Source of estimated volume: Map 15-1 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,718.9 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 6,000 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Unit cost : $0.484 /LCY <br />b Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Ca_t H_B) <br />Dozing method : 1.00 _ <br />(gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1day) <br />Spoil pile : 0.80 (fnd-tl) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.36 <br /> <br />Adjusted unit production : 610.79 LCY/hr <br />Adjusted fleet production : 2,443.18 LCY/hr <br /> <br />Total job time : 1.73 Hours <br />Total job cost : $2,045