My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-02_REVISION - C1981008 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2009-10-02_REVISION - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:58 PM
Creation date
10/2/2009 2:54:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
10/2/2009
Doc Name
Preliminary Adequacy Review Letter
From
DRMS
To
Greg Lewicki & Associates
Type & Sequence
TR59
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C -1981-008 TF -59 <br />PAR — mit <br />02 <br />Page 2 of <br />SW-N3 Pre Mine entries for May-84 May-84 thru Nov-84 Nov-84 are missing, as is the entry for Nov- <br />8 7. (Perhaps there was no data collected for these ninths` <br />SW-N3 Post trine shows the incorrect year (2009) beginning with Oct- <br />For SW-N 108, the data shown for Oct-03 thru S ep-04 is incorrect — perhaps data for <br />SW-NI04 was incorrectly entered here. <br />• Data shown for SW-N 10 8 from Oct - 04 t Sep - is actually the data for SW -I19 <br />for those months, and should he replaced with the correct information for SW -I1. <br />For SW-N109, the data for Oct-04 thru Sep-05 are missing (mistakenly shown for <br />SW-N 1 08) <br />3 . The y -axis scales for the Calamity Drava pH and Tuttle Draw y pH are so large that the' <br />graphs c very little real information. F your future reference, rather than <br />using the full potential pH range of 0 to 14 it would he more meaningful to limit the <br />range from 6 to 10. <br />Items described in the previous two paragraphs should be corrected for the sake of accuracy, <br />but their resolution will not impact the Division's adequacy and approval rocess for - . <br />This concludes the Preliminary Adequacy Review for TR-59. Please do not hesitate to contact <br />e with any questions that may arise. <br />Sincerely, <br />Marra L. Talvltre, P.E. <br />Environmental Protection Specialist <br />Enclosure — (1) —Memo from Michael Baulay, DBMS <br />cc: Ross Gu Western Fuels- Colorado <br />Sandy Brown, D RMS t �)� <br />Michael Boulay, DRM <br />
The URL can be used to link to this page
Your browser does not support the video tag.