My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-01_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-10-01_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
10/2/2009 2:47:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/1/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Report- 9/13/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec' <br />Earth & Environmental <br />Location This Week <br />(tons) Cumulative Comments <br />So Cresson Clay Processing 186 84,548 <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 186 120,364 <br />I) New ADR Water Tank and Waterline <br />Previously placed HDPE pipe and pipe bedding was backfilled using material removed during <br />trench excavation. Backfilling was performed using a CAT 345 track excavator, a CAT 966 front- <br />end loader, and a 10-ton vibratory smooth drum roller. <br />Trench excavation and pipe bedding placement continued for the new ADR/Crushing water line <br />using a CAT 330 excavator and a CAT 966 front-end loader. <br />J) Miscellaneous <br />Exposing of the old Phase IV solution lines at the northeast corner of the facility continued using a <br />CAT 330 excavator and a John Deere 35D track excavator. Areas were cover over the existing <br />Phase IV geomembrane was assumed to be less than 6 feet were test pitted, with the constant <br />observation by an AMEC representative. The excavations were performed using a John Deere 35D <br />excavator. No liner was encountered during the excavations. <br />Removal of the old solution lines continued today by cutting the welds in the lines using an <br />oxy/acetylene cutting torch. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial during the week. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />VLF Weekly Report WE 09.18.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.