My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-06-09_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:29 PM
Creation date
10/1/2009 9:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : <br />- $0.00 <br />- 0 <br /> Operator cost/hour: i32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,500 CCY factor : 1.165 volume : 1,748 LCY <br /> <br />Source of estimate d volume : SB-101 and SB- 102 <br />Source of estimated swell factor : CAT Handbook <br /> <br /> <br />HOURLY PRODUCTION ...................._....._......_.. <br />Job Condition Correction Factors ..... _......._........_..._ :;<.` ::::.. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efFciency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.30 (Cat HB) <br />Average push gradient : 30.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,300 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 <br />Material weight : 2,900 Ibs/LCY Net correction : 0.11 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 223.54 LCY/hr <br /> Adjusted fleet production : 894.17 LCY/hr <br /> <br /> <br />JOB TIME AND COST ...............::::::::::::............................ ............................ <br />Fleet size : 4 Dozer(s) Total job time : 1.95 Hours <br />Unit cost : $0.915 /LCY Total job cost : $1,599 <br />
The URL can be used to link to this page
Your browser does not support the video tag.