Laserfiche WebLink
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal RN-05 <br />Task description : Rip storage bench access road <br />............................................................................................................................................................................................... <br />::::::..................................................................................................................................................................................... <br />HOURLY E ......... <br />QU.IPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 perday <br />Attachment no. 2:3-shank ripper <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 0.40 acres Rip depth (ft) : 2.00 Volume : 1,291 BCY or CCY <br /> <br />Source of estimated quantity : SB-101 and SB-102 <br />Source of estimated load factor : NA <br /> <br /> <br /> <br />.................................. <br />HOURLY PRODUCTION ................. <br />..: ... ........ <br />ON <br /> <br />.................................... <br />.................................... <br /> <br />......................................................................... <br />....................................................................... <br /> <br />........................ <br />........................ <br /> <br />................................... <br />................................... <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2, 702.54 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 6,300 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 200.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.838 acres/hour <br />Unadjusted production : 2,702.54 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) <br />Net job correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />0.83 multiplier <br />2,243.11 cu. yds./hour <br />8,972.44 cu. yds./hour <br />0.14 hours <br />Unit cost : $0.095 per cu. yd. Total job cost : $122