Laserfiche WebLink
Agency or organization name : Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Regrade light use roads for water tank topsoil pile <br />....................................................................................................... <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower : 405 <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br />Source of estimated volume : Division estimate <br />Source of estimated swell factor : CAT Handbook <br />xxxx: <br /> <br />...... <br />_..... _....... <br />HOURLY PRODUCTION <br />......::::::::. <br />.____ .......... <br />::::::::::.:::::::::.:..:::::<::.;::«.:: <;;: <br />..._._............. ,_ :,.:::;.;::::: <br />Job Condition Correction Factors <br />....................... <br />::.;........_............ <br />.... <br />...::::::::.::.. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted rill or embankment Spoil pile : 0.80 (fnd-o <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,350 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.36 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 441.76 LCY/hr <br /> Adjusted fleet production : 1,767.04 LCY/hr <br /> <br />::..:.... <br /> <br />JOB TIME AND COST ........:..::::::: :::::::::::.::::::::::::::::::::::::: <br />............... <br />:................................................ <br />........................... <br />.......... . <br />Fleet size : 4 Dozer(s) Total job time : 0.67 Hours <br />Unit cost : $0.463 /LCY Total job cost : $547 <br />