Laserfiche WebLink
Agency or organization name : Colorado Division Of Mining, Reclamation And Safety <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Replace topsoil from stockpile to water tank topsoil pile and roads <br /> <br /> <br />.HOURLY EQUIPMENT COST <br />......... ........ ....... <br />.................................... <br />............................... <br />........................... <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type : Semi-Universal - <br /> Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br /> Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cost/hour : $818.13 <br /> <br /> <br />MATERIAL QUANTITIES ....................... ...................... ............................._.......................................... <br />..... <br />............ ............... <br />......................... <br />Initial Swell Loose <br />volume : 4,679 BCY factor : 1.250 volume : 5,849 LCY <br /> <br />Source of estimated volume : Division estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />........... <br />HOURLY PRODUCTION .................._....... Correction Factors::: <br />Job Condition :::.._............................ ... . .. .... .. Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.14 (Cat HB) <br />Average push gradient : 6.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,350 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.51 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 465.22 LCY/hr <br /> Adjusted fleet production : 1,860.86 LCY/hr <br /> <br />::::::.:::::::::::::::::::::::::: <br />JOB TIME AND COST ::::::::::::::::::.::::::::::::::::::.::::::::::::..................................................................... ............................... ............................ <br />Fleet size : 4 Dozer(s) Total job time : 3.14 Hours <br />Unit cost : $0.440 /LCY Total job cost : $2,571 <br />