Truck/Loader Team Work cont'd Task # : 010 <br />Loading Tool Cycle Time : Number of loading tool passes required to fill truck <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />sheet 2 of 2 <br />2 passes <br />Track loaders - material descr.: NA <br />- cycle time elements (min.) : Load : NA Maneuver : NA <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml <br />Dump : 0.100 <br />0.575 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Material 314" to 6" diameter 0.000 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high and up 0.000 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle time adjustment : -0.060 minutes <br /> Adjusted loader cycle time (total time per loader pass) : 0.495 minutes <br /> Net load time per truck * : 0.595 minutes <br />Truck Cycle Time : • bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />Truck exchange time **: 0.50 minutes........ Adjusted for site altitude : 0.500 minutes <br />Truck load time: 0.595 minutes........ Adjusted for site altitude : 0.647 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.900 minutes <br />" set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1st loader cycle) <br />Truck travel (haul & return) time: Road condition :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul route <br />Road <br />segment # Haul distance <br />(fee() Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(feet/minute) Travel time <br />(minutes) <br />1 4,000 3.00 3.00 6.00 1855 2.203 <br />2 400 -2.00 3.00 1.00 2895 0.160 <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time ** : 2.363 minutes <br />1 400 2.00 3.00 5.00 2814 0.168 <br />2 4,000 -3.00 3.00 0.00 2938 1.362 <br />I I I I I I <br />' travel time shown for each segment includes acceleration/deceleration adjustment Return time**: 1.529 minutes <br />"total haul and return time shown includes altitude adjustment Total truck cycle time : 5.939 minutes <br />Loading tool unit production : 447.36 LCY/hour...... Adjusted for job efficiency : 371.31 LCY/hour <br />Truck unit production : 86.38 LCY/hour...... Adjusted for job efficiency : 71.70 LCY/hour <br />Optimal no. trucks/loading tool : 5 trucks........... Selected no. trucks/loader : 5 trucks <br /> Adjusted hourly truck team production : 358.49 LCY/hr <br /> Adjusted hourly single truck/loader team production : 358.49 LCY/hr <br /> Adjusted hourly multiple truck/loader team production : 358.49 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 7.61 Hours <br />Unit cost : $2.469 /LCY Total job cost : $6,737