My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_PERMIT FILE - C1980007
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-06-09_PERMIT FILE - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:29 PM
Creation date
9/30/2009 10:57:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Agency or organ <br />Task # : 010 <br />Date : 0411312009 <br />User : TAK <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />ization name : Colorado Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job #: C-80-007 <br />_ County:Gunnison Abbreviation :none <br />Site : West Elk Mine Filename : 0007-010 <br />sheet 1 of 2 <br />Permit or other job action : Midterm Review 6 <br />Task description : Haul remaining coal material at /oadout to refuse pile <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck : Generic 10-12 cy, 6x4 <br />-Loader : CAT 966G (2002) <br />Support equipment -Load area : Cat D9R - 9SU (2005) <br />-Dump area : Cat D9R - 9SU (2005) <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />% Utilization-machine : 100 90 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cost/hour : $12.32 $29.49 $62.35 $62.35 NA NA <br />Operating cost/hour : $43.93 $36.35 $103.27 $103.27 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $21.72 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals : $77.97 $98.62 $198.40 $198.40 NA NA <br />Number of units : 5 1 1 1 0 0 <br />Group subtotals : Work : $488.46 Support : $396.80 Maintenance : $0.00 <br /> Total work team cost/hour : $885.26 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,728 LCY factor : NA volume : 2,728 LCY <br />Source of quantity take-off :Map 53 <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 1,600 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Coal - Bituminous, Raw Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity: 22.12 LCY Adjusted volume': 12.00 LCY <br />Final truck volume based on number of loader passes : 8.55 LCY <br />`truck volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 6,300 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader Source <br />Descr.: Other - soil, boulders, roots (80 400%) Altitude adj.: 1.000 0.920 (Cat HB) <br />Bucket fill factor : 0.900 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 4.275 LCY Net correction : 0.830 0.764
The URL can be used to link to this page
Your browser does not support the video tag.