Laserfiche WebLink
Last unit cost update: 7/1/2007 Page 2 of 6 <br />STRUCTURE or ITEM DESCRIPTION QUANTITY UNIT CIRCES DEMO. MENU SELECTION UNIT COST TOTAL COST % LIAB. TOTAL <br /> It ft ft If in (100%LIAB.) (ACTUAL) <br />Waste water treatment plant <br />Superstructure 55 20 12 13,200 CF Demo/disp./exc. pit - 10K' haul $0.22 $2,877.60 100% $2,877.60 <br />Floor 55 20 6 1,100 SF Concr., demo. only, mesh reinf., 12" th. $10.51 $11,561.00 100% $11,561.00 <br />Footings 1 3 150 150 LF Demo/disp./existing pit, l.5'X3'-200 ft. $12.04 $1,806.00 100% $1,806.00 <br />Water storage tank <br />Superstructure 24 36 24,428 CF Demo/disp./exc. pit- 10K' haul $0.22 $5,325.20 100% $5,325.20 <br />Floor 0.667 36 8 1,018 SF Demo.disp exc. pit, 8" th. - 200 ft. $2.68 $2,727.74 100% $2,727.74 <br />Footings 3 36 113 113 LF Demo/disp./exc. pit, 1'X2' - 200 ft. $8.03 $907.39 100% $907.39 <br />Surface shop <br />Superstructure 150 50 17.5 131,250 CF Demo/disp./exc. pit - 10K' haul $0.22 $28,612.50 100% $28,612.50 <br />Floor 150 50 4 7,500 SF Demo.disp exc. pit, 4" th. - 200 ft. $1.34 $10,050.00 100% $10,050.00 <br />Footings 1 2 400 400 LF Demo/disp./exc. pit, 1'X2'- 200 ft. $8.03 $3,212.00 100% $3,212.00 <br />Fire building north <br />Superstructure 14 10.5 8 1,176 CF Demo/disp./exc. pit- 10K' haul $0.22 $256.37 100% $256.37 <br />Floor 14 10.5 6 147 SF Demo.disp exc. pit, 6" th. - 200 ft. $2.01 $295.47 100% $295.47 <br />Footings 1 2 49 49 LF Demo/disp./exc. pit, 1'X2' - 200 ft. $8.03 $393.47 100% $393.47 <br />Fire building north side <br />Superstructure 10 10 9 900 CF Demo/disp./exc. pit - 10K' haul $0.22 $196.20 100% $196.20 <br />Floor 10 10 6 100 SF Demo.disp exc. pit, 6" th. - 200 ft. $2.01 $201.00 100% $201.00 <br />Footings 1 2 40 40 LF Demo/disp./exc. pit, 1'X2'- 200 ft. $8.03 $321.20 100% $321.20 <br />MCC-5 <br />Superstructure 15 10 8 1,200 CF Demo/disp./exc. pit- 1OK' haul $0.22 $261.60 100% $261.60 <br />Floor 15 10 6 150 SF Demo.disp exc. pit, 6" th. - 200 ft. $2.01 $301.50 100% $301.50 <br />Footings 1 2 50 50 LF Demo/disp./exc. pit, 1'X2' - 200 ft. $8.03 $401.50 100% $401.50 <br />MCC-2 <br />Superstructure 12 8 8 768 CF Demo/disp./exc. pit- 10K' haul $0.22 $167.42 100% $167.42 <br />Floor 12 8 6 96 SF Demo.disp exc. pit, 6" th. - 200 ft. $2.01 $192.96 100% $192.96 <br />Footings 1 2 40 80 LF Demo/disp./exc. pit, 1'X2'- 200 ft. $8.03 $642.40 100% $642.40 <br />Guard shack <br />Superstructure 12 12 10 1,440 CF Demo/disp./exc. pit- 10K' haul $0.22 $313.92 100% $313.92 <br />Substation <br />Superstructure 80 50 20 80,000 CF Demo/disp./exc. pit- 1OK' haul $0.22 $17,440.00 100% $17,440.00 <br />Floor 80 50 8 4,000 SF Demo.disp exc. pit, 8" th. - 200 ft. $2.68 $10,720.00 100% $10,720.00 <br />Footings 1.5 3 260 260 LF Demo/disp./exc. pit, 1.5'X3' - 200 ft. $18.06 $4,695.60 100% $4,695.60 <br />Takeup tower <br />Superstructure 25 21 23 12,075 CF Demo/disp./exc. pit- 10K' haul $0.22 $2,632.35 100% $2,632.35 <br />Floor 25 21 12 525 SF Demo.disp exis. pit, 12" the 10,000 ft. $3.95 $2,073.75 100% $2,073.75 <br />Footings 2 3 92 92 LF Demo/disp./exc. pit, 2'X3'- 200 ft. $24.08 $2,215.36 200% $4,430.72 <br />Screening facility <br />Superstructure 62 52 36 116,064 CF Demo/disp./exc. pit- 10K' haul $0.22 $25,301.95 100% $25,301.95 <br />Floor 52 36 6 1,872 SF Demo.disp exc. pit, 6" th. - 200 ft. $2.01 $3,762.72 100% $3,762.72 <br />Footings 1.5 2 2,389 2,389 LF Demo/disp./exc. pit, t'X2'-200 ft. $8.03 $19,183.67 100% $19,183.67 <br />Crusher building <br />Superstructure 25 20 42 2,100 CF Demo/disp./exc. pit - 10K' haul $0.22 $457.80 100% $457.80 <br />Floor 25 20 6 500 SF Demo.disp exc. pit, 6" lh. - 200 ft. $2.01 $1,005.00 100% $1,005.00 <br />Footings 3 2 366 366 LF Demo/disp./exc. pit, 2'X3- 200 ft. $24.08 $8,813.28 100% $8,813.28 <br />Reclaim tunnel <br />Roof 16 400 12 6,400 CF Demo/disp./exc. pit- 10K' haul $0.22 $1,395.20 100% $1,395.20 <br />Walls 12 400 3 6,400 SF Concr., demo. only, ave. reinf., 24" th. $8.50 $54,400.00 100% $54,400.00 <br />Floor 16 400 3 711 SF Demo.disp exc. pit, 4" th. - 200 ft. $1.34 $952.74 100% $952.74 <br />Escapeway tunnel 6 48 6 LF Pipe, CMP - 48 in. diam. $6.19 $37.14 100% $37.14 <br />Feed conveyor drive tower <br />Superstructure 21 19 60 23,940 CF Demo/disp./exc. pit- 10K' haul $0.22 $5,218.92 100% $5,218.92 <br />Floor 19 13.5 6 257 SF Demo.disp exc. pit, 6" th. - 200 ft. $2.01 $515.57 100% $515.57 <br />Footings 2 3 967 967 LF Demo/disp./exc. pit, 2X3- 200 ft. $24.08 $23,285.36 100% $23,285.36 <br />Transfer structures (3) <br />Superstructures (3) 57 13 38 28,158 CF Demo/disp./exc. pit - 10K' haul $0.22 $6,138.44 100% $6,138.44 <br />Floor 39 10 6 390 SF Demo.disp exc. pit, 6" th. - 200 ft. $2.01 $783.90 100% $783.90 <br />Stacking tube 1 94 12 diam 12 10,630 CF Demo/disp./exc. pit - 10K' haul - Concr. $0.22 $2,370.60 100% $2,370.60 <br />Slacking tube 2 93 12 diam 12 10,517 CF Demo/disp./exc. pit - 10K' haul - Concr. $0.22 $2,345.38 100% $2,345.38 <br />Stacking tube 3 91 12 diam 12 10,291 CF Demo/disp./exc. pit - 10K' haul - Concr. $0.22 $2,294.94 100% $2,294.94 <br />Tunnel <br />Floor 505 12 36 36 CY Concr. pave., demo., 7-24" th., reinf. $92.00 $3,312.00 100% $3,312.00 <br />Roof 505 12 36 36 CY Concr. pave., demo., 7-24" th., reinf. $92.00 $3,312.00 100% $3,312.00 <br />Walls 505 12 3 36 CY Concr. pave., demo., 7-24" th., reinf. $92.00 $3,312.00 100% $3,312.00 <br />Total for this page before location adjustment $281,215.48 <br />Location adjustment: 92.32% Total for this page after location adjustment $259,618.13