Laserfiche WebLink
DILL PIT <br />Exhibit C <br />j) The Stormwater Discharge Permit that will be acquired will deal with <br />compliance with applicable Colorado water laws and regulations governing injury to <br />existing water rights. The historical flows of storm water should not be affected. <br />k) No refuse or acid and toxic producing materials will be exposed during mining <br />so no plan is needed. If any refuse is encountered it will be disposed of off-site in an <br />approved landfill. <br />1) The Stormwater Discharge Permit will be designed to minimize damage to the <br />hydrologic balance and prevent off-site damage. This operation is designed to provide for <br />a stable configuration of the reclaimed area to be used for. grazing. As needed, a low <br />earthen berm will be left for control of storm water runoff to the Big Sandy Drainage. <br />m) The deposit is proposed to be processed onsite to make road base for roads and <br />structural fill for other construction uses in the eastern part of the Elbert County and the <br />western part of Lincoln County. This will be done by a portable screening/washing plant. <br />Please see map Exhibit E. <br />n) The primary commodities to be mined will be sand and gravel for structural fill <br />and road material. Potentially, the pit may provide sand and gravel for concrete and <br />asphalt. <br />o) There are no known incidental products to be mined by this proposed <br />operation. If any incidental products are discovered, The Division will be duly notified. <br />p) No blasting will be used on this site.