DILL PIT <br />Exhibit C <br />e) The major components of the mining operation are limited. Access to the pit <br />will be by County Road 189. County road 189 connects to Highway 24. This distance is <br />approximately 0.20 miles. There will be no office or shop/maintenance facility. There <br />may be some storage sheds and trailers. The equipment to be used on the site can be <br />loaders, trucks, belly dump, end dump, dozer, grader (maintainer), scraper, track hoe, flat <br />bed trucks (low boys), asphalt lay down machine, a screening and/or wash plant, an <br />asphalt hot plant, and portable scales. The production will be based on the demand <br />needed and is anticipated to vary from year to year, depending on the scheduling of larger <br />projects. Since this is a dry open pit operation there will be no underground openings <br />such as adits or ventilation facilities. The exhibit "E" map shows the pertinent details. <br />f) There are no existing significant disturbance to the land surface. There will be <br />no mine benches, impoundments, or waste rock disposal areas. <br />g) A new access road from County Road 189 to the pit is needed and will be part <br />of the 9.9 acre area. No improvements on existing roads are needed, but a driveway <br />across the borrow ditch will need to be constructed. Because the driveway will be located <br />at the top of a hill, a culvert will not be needed. All storm water will be kept on-site by <br />the pit and low earthen berms as needed. There will be no associated drainage or runoff <br />conveyance structures to be built with this operation. All drainage will be directed <br />toward the face of the active pit. <br />h) The only water to be used will be that amount possibly necessary for dust <br />control which can be supplied by the operator. If material washing is needed, the water <br />will be supplied from off-site or from an existing pond on the property. Typically, no <br />water for processing of material will be required. Sanitary water will not be used or <br />needed. Porta-John Toilets to be used. Drinking water will be bottled and imported to <br />the site daily when people are working. <br />i) The pit will be excavated to a total depth of approximately 12 to 25 feet, to <br />groundwater. The pit will not be excavated into the groundwater encountered. The sand <br />and gravel deposits will be excavated to approximately one foot above the groundwater <br />depth and as far laterally as possible. The existing overburden soils on the property will <br />be used to construct the needed final 3 H:1 V slopes. The only water involved will be that <br />amount on the surface of the permit area and a Stormwater Discharge Permit will be <br />acquired to deal with this small amount. All fuel storage containers will have <br />containment structures.