My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-25_PERMIT FILE - M2009076 (42)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009076
>
2009-09-25_PERMIT FILE - M2009076 (42)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:47 PM
Creation date
9/28/2009 3:07:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
PERMIT FILE
Doc Date
9/25/2009
Doc Name
EPA Superfund Record of Decision
From
Venture Resources
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLLAPSE OF TAILINGS AND WASTE ROCK PILES INTO CLEAR CREEK AND NORTH CLEAR CREEK; <br />- RUNOFF FROM THE WASTE ROCK AND TAILINGS PILES CONTAMINATING CLEAR CREEK AND NORTH <br />CLEAR CREEK; AND <br />- INHALATION OR INGESTION OF MATERIAL FROM THE PILES. <br />THE IMPACT DUE TO POTENTIAL COLLAPSE OF THE BIG FIVE AND GREGORY INCLINE WASTE ROCK/TAILINGS <br />PILES WERE EVALUATED IN THE SECTION ENTITLED "SITE CHARACTERISTICS". AS DISCUSSED IN THAT <br />SECTION, BOTH AWQC AND MCLS WOULD BE EXCEEDED IN CLEAR CREEK AND NORTH CLEAR CREEK. <br />THE SITE CHARACTERISTICS SECTION ALSO SUMMARIZED THE EFFECTS OF RUNOFF DURING STORM EVENTS. <br />ACTUAL DATA INDICATE THAT AWQC ARE EXCEEDED IN CLEAR CREEK AND NORTH CLEAR CREEK. <br />IN ADDITION TO POTENTIAL IMPACTS DUE TO RUNOFF AND COLLAPSE, THE ADVERSE EFFECTS OF INHALATION <br />OF INGESTION OF MATERIAL FROM THE PILES WERE EVALUATED AND SUMMARIZED IN THE SITE <br />CHARACTERISTICS SECTION (TABLE 1). UNDER CURRENT (EPISODIC EXPOSURE) WORST CASE CONDITIONS, THE <br />RISK FOR INGESTION OF SOIL WAS 1 X 10-4 (ONE EXCESS CANCER DEATH IN 10,000 PEOPLE OVER A <br />LIFETIME). UNDER AVERAGE CONDITIONS, THE RISK WAS 2 X 10-5. INHALATION OF DUST UNDER AVERAGE <br />AND WORST CASES INDICATED RISKS OF 5 X 10-6 TO 1 X 10-4. UNDER A POTENTIAL FUTURE USE <br />RESIDENTIAL SCENARIO, THE RISK OF INGESTION UNDER AVERAGE CONDITIONS RANGED FROM 8 X 10-5 TO <br />1 X 10-4. UNDER MAXIMUM PLAUSIBLE EXPOSURE CONDITIONS THE RISK RANGED FROM 4 X 10-4 TO <br />9 X 10-4. <br />SLOPE STABILIZATION AND RUNON CONTROL ALTERNATIVE: BASED ON THE DETAILED EVALUATION OF CRITERIA <br />CITED PREVIOUSLY, SLOPE STABILIZATION AT THE BIG FIVE WASTE ROCK PILES WOULD BE ACCOMPLISHED BY <br />EXCAVATION, SLOPE CUTBACK AND TOE RIP-RAP TO PREVENT EROSION AND TAILINGS COLLAPSE INTO CLEAR <br />CREEK. BASED ON DETAILED EVALUATION AT THE GREGORY INCLINE, THE CURRENT GABION WALL WOULD BE <br />MAINTAINED UNTIL MONITORING INDICATES REMEDIATION IS NECESSARY OR UNTIL THE TAILINGS ARE REMOVED <br />FOR REPROCESSING. AT THAT TIME, A PERMANENT SOLUTION WILL BE IMPLEMENTED. RUNON CONTROLS SUCH <br />DIVERSION DITCHES OR CULVERTS WOULD BE PLACED ON THE UPGRADIENT SIDE OF ALL SITES. <br />SLOPE STABILIZATION WOULD BE A PERMANENT SOLUTION THAT ELIMINATES COLLAPSE OF THE TAILINGS AND <br />WASTE ROCK PILES. THE POTENTIAL FOR CATASTROPHIC CONTAMINATION OF CLEAR CREEK AND NORTH CLEAR <br />CREEK WOULD BE ELIMINATED. THE RUNOFF WOULD ALSO BE REDUCED BY ELIMINATING RUNON AT THE <br />UPGRADIENT SIDES OF THE PILES. NO REDUCTION IN IMPACT DUE TO DUST OR INGESTION WOULD BE <br />ACHIEVED. <br />CAPPING ALTERNATIVES: RESULTS OF THE SCREENING ANALYSIS INDICATED THAT BECAUSE OF THE STEEP <br />SLOPES ONLY TWO TECHNICALLY FEASIBLE CAPPING ALTERNATIVES EXIST FOR WASTE PILES AT THE NATIONAL <br />TUNNEL AND ARGO TUNNEL: SYNTHETIC LINERS OR SOIL CEMENT COVERS. BECAUSE OF THE STEEP SLOPES AT <br />BOTH SITES, A SOIL COVER WOULD NOT REMAIN ON A SYNTHETIC LINER. A BARE LINER WOULD BE EXTREMELY <br />SUSCEPTIBLE TO DAMAGE AND/OR VANDALISM WITH FREQUENT REPLACEMENT REQUIRED. THE SOIL CEMENT <br />COVER RETAINS THE NATURAL COLOR OF THE TAILINGS AND WASTE ROCK MATERIAL AND IS PROBABLY <br />PREFERRED BY THE COLORADO HISTORICAL SOCIETY AND LOCAL RESIDENTS OVER A LINER. THUS, A SOIL <br />CEMENT COVER IS THE PREFERABLE CAPPING ALTERNATIVE WHICH COULD BE IMPLEMENTED AT THE NATIONAL <br />TUNNEL AND ARGO TUNNEL WASTE PILES. <br />BEFORE THE GREGORY INCLINE CAN BE CAPPED, THE TEMPORARY GABION WALL WOULD BE REPLACED. A TIMBER <br />CRIB WALL IS PRICED COMPARABLY WITH OTHER ALTERNATIVES AND WOULD PROBABLY BE PREFERRED BY THE <br />COLORADO HISTORICAL SOCIETY. ALTERNATIVES EVALUATED FOR CAPPING WERE A SYNTHETIC LINER AND SOIL <br />CEMENT COVER. THE SOIL CEMENT COVER IS A PERMANENT COVER AND IS PROBABLY PREFERRED BY THE <br />COLORADO HISTORICAL SOCIETY OVER OTHER CAPPING ALTERNATIVES. <br />THE BIG FIVE WASTE ROCK PILE PROVIDES A TECHNICAL CHALLENGE FOR CAPPING AND PROTECTION AGAINST <br />FLOOD EROSION. PHYSICAL CONSTRAINTS IMPOSED BY THE ORIGINAL TOPOGRAPHY AND THE LOCATION OF <br />CLEAR CREEK ALONG ONE SIDE OF THE PILES DICTATE THAT PILES WOULD BE REGRADED AND RIP-RAP WOULD <br />* PLACED FOR FLOOD PROTECTION. THE REGRADED PILES WOULD THEN BE COVERED BY A SOIL CEMENT CAP. <br />SYNTHETIC LINER COULD BE PLACED, BUT NO SOIL COVER COULD BE PUT ON THE LINER. <br />CAPPING OF THE QUARTZ HILL WASTE ROCK PILE WAS EVALUATED FOR THREE AREAS: PARKING LOTS WITH <br />ADJOINING SIDE SLOPES, AN AREA NEAR THE TUNNEL ENTRANCE, AND ALL REMAINING AREAS FROM THE <br />PARKING LOTS TO THE TUNNEL PORTAL. THE SCREENING ANALYSIS INDICATED THAT SOIL CEMENT COVERS
The URL can be used to link to this page
Your browser does not support the video tag.