Laserfiche WebLink
• approximately 9,474' bearing N 01 45' W at a starting elevation of 7,600'. Venture Resources has a right of way <br />easement in this tunnel for maintenance, etc. <br />Baseline groundwater quality has been observed at the Big Five Tunnel and is included in Exhibit C. <br />The proposed affected area currently does not produce any surface drainage and no discharge will result from the <br />proposed operation. All process water is to be recycled back to the proposed processing mill. Refer to Exhibit C for <br />more process information. <br />6.3.2(d) <br />Wildlife Statement: <br />Letter from CO Div. of Wildlife attached as next page <br /> <br />0