Laserfiche WebLink
EFCY plans to supplement this with excess soil material from the <br />' • Corley (Newlin Creek Mine) reclamation project located adjacent <br />to the mine facilities area. Approximately 7,000 cy of excess <br />material is stockpiled on the Newlin Creek Mine Site. <br />Approximately 10,000 cy of soil material from stockpile M-1 and <br />6,000 cy of soil material from the Newlin Creek stockpile will <br />be redistributed over the mine facilities area following <br />completion of backfilling and grading activities. <br />r1 <br />LJ <br />• <br />C:\860 \TR20R9p(2) <br />04/29/95 12:33pm kep 2.05.4-13a Revised - April 1995 <br />