Laserfiche WebLink
The Union Milling Company <br />7500 W. Mississippi Ave., A-170 <br />Lakewood, CO 80226-4577 <br />+1.303.947.3499 <br />September 22, 2009 <br />Mr. Peter Hays <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203-2273 <br />Re: Permit M-1990-057, June 18, 2009 Inspection <br />Dear Mr. Hays, <br />SO ? . <br />Union Milling Company is providing the following response and extension request on behalf of <br />Calais Resources for Item 6 of the June 18, 2009 inspection of the Leadville Mill and Hopemore <br />Shaft properties, Permit M-1990-057. Your inspection report of June 26, 2009 specified the Item <br />6 problem as listed below. <br />Item 6 - Canada thistle was observed in several areas within the mill site. <br />The Division responded to the August 24, 2009 extension request on September 18, 2009 with a <br />request for changes to the UMC submittal. UMC has been unable to fully address the Division <br />response and requests an additional 30-day extension to update the weed control plans and <br />subsequently allow preparation of the technical revision for inclusion in the existing permit. <br />Please contact me directly for additional information or clarification to the response. I can be <br />reached at 303-638-2573, melderLa?unionmilling com, or PO Box 36099, Denver, CO 80236- <br />0099. <br />Sincerely, <br />?? .*N,- C:Z)r?? <br />Michael Elder <br />Environmental Compliance and Permitting <br />Union Milling Company, LLC <br />Cc: Robert Calder - Hopemore Shaft <br />Tom Hendricks - Calais Resources Colorado, Inc.