My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-25_REPORT - C1996084
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996084
>
2009-09-25_REPORT - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:48 PM
Creation date
9/25/2009 3:29:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
REPORT
Doc Date
9/25/2009
Doc Name
4th Quarter 2008 Inspection of Excess Spoil Fill Reports
From
Peak Project Management, LLC
To
DRMS
Permit Index Doc Type
Mine Inflow Reports
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spoil Fill #8, <br />December 29, 2008 <br />Page 2 <br />FILL PLACEMENT <br />Fill placement has been completed in accordance with the approved plan. No additional fill placement is <br />anticipated. <br />COVER MATERIAL <br />Final fill configuration has been established and topsoil material has been placed on the excess spoil-fill. <br />The area was mulched and seeded in the fourth quarter of 2003. Soil was placed and spread on the upper <br />most surface of the fill in May of 2004. During the second quarter of 2005, areas disturbed by maintenance <br />of the armored down-drains were seeded using certified weed free straw and the approved rangeland seed <br />mix. The construction access road east of the east down-drain was hand mulched and seeded during August <br />of 2006. <br />STRUCTURAL INTEGRITY <br />The entire excess spoil fill facility was examined for signs of failure and instability such as tension cracks, <br />ground movement, springs and seeps, and standing water. No indication of potential instability was <br />observed. <br />DOCUMENTATION AND OTHER OBSERVATIONS <br />Winter conditions prevail. Ground conditions are dry with some snow cover on the north facing slopes <br />Both down-drains experienced some damage from August storm events. Operator has completed repairs on <br />the down drains; Erosion damage remains to be repaired on the upper west lateral ditch.. Overall, site is in <br />good condition except as noted. <br />CERTIFICATION <br />This inspection was conducted by Ronald G. Thompson, a qualified professional and MSHA certified <br />inspector of earth and rockfill embankments and impoundments, under the direction of Mr. Charles <br />McGlothlin, a registered professional engineer licensed in the State of Colorado. <br />This is to certify, to the best of my knowledge and belies; that Fill No. 8 construction and placement, as <br />noted since the previous certification and as determined during this inspection and discussions with mine <br />personnel, is in accordance with designs as proposed by CTL Thompson in their report dated April 27 and <br />amended July 27, 2001 and as approved by the Division of Minerals and Geology. <br />Ronald G. Thompson <br />Inspector <br />Charles cGlothlin =L t3 ij z r ??`?` <br />Professional Engineer <br /> <br />.i r '??- .j ? Cx• <br />•a1. ae•iSi .tom: •..?.
The URL can be used to link to this page
Your browser does not support the video tag.