Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 015 <br />Date : 0710712009 <br />User: JDM <br />State : Colorado <br />County:Moffat <br />Site : Trapper Mine <br />Agency or organization name : Colorado Division Of Reclamation, <br />Permit or other job action : Permit Revision PR-06 <br />Task description : G Dip Pit East (Post Slide) <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D11R - 11 SU (2005) Horsepower : 850 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 3 per day <br />Attachment no. 2 :NA <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $85.09 NA <br /> Operating cost/hour : $224.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $33.03 NA <br /> Total unit cost/hour : $342.71 Total fleet cost/hou r : $2,398.97 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 271,980 LCY factor : NA volume : 271,980 LCY <br /> <br />Source of estimated volume :Permit Appendix A, table 1.4-3 <br />Source of estimated swell factor : Cat <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.80 (user) <br />Average push distance : 315 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 955.8 LCY/hr Dozing method : 1.17 (user) <br /> Visibility: 0.90 (user) <br />Material consistency description : Job efficiency : 0.79 (3shifts /day) <br />Consolidated stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient:- 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.93 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2475 Ibs/LCY Net correction : 0.76 <br />Weight description : <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 724.10 LCY/hr <br /> Adjusted fleet production : 5,068.73 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 7 Dozer(s) Total job time : 53.66 Hours <br />Unit cost : $0.473 /LCY Total job cost : $128,725 <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Permit/job# :C-1981-010 <br />Abbreviation :none <br />Filename :C010-015 <br />And