My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-28_REVISION - C1981010 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2009-08-28_REVISION - C1981010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:07 PM
Creation date
9/22/2009 2:10:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
8/28/2009
Doc Name
Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
PR6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 014 State :Colorado Permit/job# :C-1981-010 <br />Date : 0710712009 County: Moffat Abbreviation : none <br />User: JDM Site : Trapper Mine Filename : C010-014 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Revision PR-06 <br />Task description : G Dip Pit West Regrade (Post Side) <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Horsepower: 850 <br />Shiftbasis : 3 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $85.09 NA <br /> Operating cost/hour : $224.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $33.03 NA <br /> Total unit cost/hour : $342.71 Total fleet cost/hou r : $2,398.97 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 358,316 LCY factor : NA volume : 358,316 LCY <br /> <br />Source of estimated volume : Permit Appendix A, table 1.4-3 <br />Source of estimated swell factor : Cat <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.80 (user) <br />Average push distance : 315 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 955.8 LCY/hr Dozing method : 1.17 (user) <br /> Visibility: 0.90 (user) <br />Material consistency description : Job efficiency : 0.79 (3shifts /day) <br />Consolidated stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.93 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2475 Ibs/LCY Net correction : 0.76 <br />Weight description : <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 724.10 LCY/hr <br /> Adjusted fleet production : 5,068.73 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 7 Dozer(s) Total job time : 70.69 Hours <br />Unit cost : $0.473 /LCY Total job cost : $169,587 <br />
The URL can be used to link to this page
Your browser does not support the video tag.