My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-16_REVISION - M2000115 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000115
>
2009-09-16_REVISION - M2000115 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:34 PM
Creation date
9/22/2009 7:40:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000115
IBM Index Class Name
REVISION
Doc Date
9/16/2009
Doc Name
Cost Summary Form
From
DRMS
To
File
Type & Sequence
AM1
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />Task #: 003 <br />Date : 0911612009 <br />User : JLE <br />State : Colorado <br />County : Las Animas <br />Site : Mulletts Excavating Pit #1 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Amendment 01 <br />Task description : Spreading Topsoil <br /> <br />HOURLY EQUIPMENT COST Basic machine : CAT 962G (2003) Horsepower 200 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $20.30 NA <br />Operating cost/hour:: - $41.99 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $100.83 Total fleet cost/hour : $201.65 <br />............. <br />MATERIAL QUANTITIES .............................................. . <br />Initial Swell Final <br />volume: 7,058 LCY factor : NA volume : 7,058 LCY <br />Source of quantity take-off : estiamte <br />Source of estimated swell factor : NA <br />.:.::.;:: ::.::.............................. <br />HOURLY PRODUCTION (Cat H8) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.550 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material - Mixed material 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high and up 0.000 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time aaustment <br />Adjusted basic cycle time <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Return : Rutted dirt, little maintenance, no water, 2" tire penetration <br />-V. VOV nunuica <br />0.490 minutes <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 300 0.00 5.00 5.00 0.3120 (Cat HB) <br />Return route : 300 0.00 5.00 5.00 0.2873 (Cat HB) <br /> i otai travel time : U.ONJJ rnmuies <br />Loader Bucket Capacity Total cycle time : 1.089 minutes <br />Rated capacity : 4.00 LCY (heaped) (Cat HS) <br />Bucket fill factor : 0.900 Other- soil, boulders, roots (80 -100%) <br />Adjusted capacity : 3.60 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat HB) <br />Site altitude : 5,700 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 198.29 LCY/Hr <br />Adjusted hourly unit production : 164.58 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 329.17 LCY/Hr <br />::............................................... <br />JOB TIME AND COST ............ . <br />Fleet size : 2 Loader(s) Total job time : 21.44 Hours <br />Unit cost : $0.613 /LCY Total job cost : $4,324 <br /> <br />Permit/job #: M-2000-115 <br />Abbreviation : none <br />Filename : M115-003
The URL can be used to link to this page
Your browser does not support the video tag.