Laserfiche WebLink
CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />........ .:.... .::::.........:.::......::::.::..... .::::.:::::.......... <br />PROJECT IDENTIFICATION ........................ <br />Task #: 002 State : Colorado Permit/job #: M-2000-115 <br />Date : 0911612009 County : Las Animas Abbreviation :none <br />User : JLE Site : Mulletts Excavating Pit #1 Filename : M115-002 <br /> <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Amendment 01 <br />Task description : Spreading Overburden over 7.5 acres <br /> <br /> <br />-:-X.:.;:::.:..::::::;:.;:.;:.;:.;:.;.:::.;::..;:.;:.:<.;:.:.;:.;:.:;::::.;;:.;:.: ::: <br />.... .. <br />;: Horsepower: <br />HOURLY EQUIPMENT COST Basic machine : CAT 962G (2003) .;:.; <br /> <br /> <br />00 <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour' $20.30 NA <br />Operatingcost/hour: $41.99 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $100.83 Total fleet cost/hour : $201.65 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 24,200 LCY factor : NA volume : 24,200 LCY <br />Source of quantity take-off : Amendment 01 Exhibit L <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION (Cat HB <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.550 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high and up 0.000 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment <br />Adjusted basic cycle time <br />-0.060 <br />U 4au <br />minutes <br />minutes <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Return : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 300 0.00 5.00 5.00 0.3120 (Cat HB) <br />Return route : 300 0.00 5.00 5.00 0.2873 (Cat HB) <br /> Total travel time : 0.5993 minutes <br />Loader Bucket Capacity Total cycle time : 1.089 minutes <br />Rated capacity : 4.00 LCY (heaped) (Cat HB) <br />Bucket fill factor : 1.100 Other - rock/dirt mixtures (100-120%) <br />Adjusted capacity : 4.40 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat HB) <br />Site altitude : 5,700 feet Job efficiency factor : 0.83 (1 shiff/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 242.36 LCY/Hr <br />Adjusted hourly unit production : 201.16 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 402.31 LCY/Hr <br />.............. <br />JOB TIME AND COST ..::. _: .. ...... <br />Fleet size : 2 Loader(s) Total job time : 60.15 Hours <br />Unit cost : $0.501 /LCY Total job cost : $12,130