Laserfiche WebLink
Permittee: WHITEWATER BUILDING MATERIALS CORP. PAGE 4 <br />Permit #: M-1977-129 <br />Operation Name: WHITEWATER 500 PIT <br />Anniversary Date: 091221009 <br />Weed control began this year on the area surrounding <br />Stage 3 - PART A. We sprayed Knapweed and White Top <br />from April thru July with water soluble 2-4-D and <br />Curtail'. <br />(3) Mining will continue in Stage 2 - PART A as we complete <br />the upper northwest area west of the Plant Site. In <br />Stage F the mine face will continue to move to the <br />east. If more area is needed, we will resume <br />stripping ahead of the mining face in that stage. <br />Mining will continue in Stage 3 - PART B to supplement <br />material being removed from the raw material stockpile <br />in Stage 6. Overburden will continue to be stockpiled <br />along the perimeter of the mined area. <br />(4) Bank sloping and grading will continue in Phase 2 - <br />PART A as needed (tan). We expect to have the Phase 2 <br />- PART A sloping complete during the 2009-2010 year and <br />final reclamation on Phase 2 - part B will begin. <br />(5) The current contact for this pit is: <br />Mr. Mark Gardner (970) 242-7538 <br />Whitewater Building Materials Corp. <br />940 South 10th Street <br />Grand Junction, CO 81502 <br />The annual report date is September 22, 2009 and the <br />effective date of all information is September 2, 2009. <br />This packet contains the Annual Report Maps, and the Annual <br />Fee check for $791.00. <br />Respectfully Submitted, <br />Whitewater Building Materials Corp. <br />Mark Gardner <br />Vice President