My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-18_REPORT - M1977129
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977129
>
2009-09-18_REPORT - M1977129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:24:44 AM
Creation date
9/18/2009 1:49:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
REPORT
Doc Date
9/18/2009
Doc Name
Annual Fee/Report/Map
From
Whitewater Building Materials Corporation
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permittee: WHITEWATER BUILDING MATERIALS CORP. PAGE 4 <br />Permit #: M-1977-129 <br />Operation Name: WHITEWATER 500 PIT <br />Anniversary Date: 091221009 <br />Weed control began this year on the area surrounding <br />Stage 3 - PART A. We sprayed Knapweed and White Top <br />from April thru July with water soluble 2-4-D and <br />Curtail'. <br />(3) Mining will continue in Stage 2 - PART A as we complete <br />the upper northwest area west of the Plant Site. In <br />Stage F the mine face will continue to move to the <br />east. If more area is needed, we will resume <br />stripping ahead of the mining face in that stage. <br />Mining will continue in Stage 3 - PART B to supplement <br />material being removed from the raw material stockpile <br />in Stage 6. Overburden will continue to be stockpiled <br />along the perimeter of the mined area. <br />(4) Bank sloping and grading will continue in Phase 2 - <br />PART A as needed (tan). We expect to have the Phase 2 <br />- PART A sloping complete during the 2009-2010 year and <br />final reclamation on Phase 2 - part B will begin. <br />(5) The current contact for this pit is: <br />Mr. Mark Gardner (970) 242-7538 <br />Whitewater Building Materials Corp. <br />940 South 10th Street <br />Grand Junction, CO 81502 <br />The annual report date is September 22, 2009 and the <br />effective date of all information is September 2, 2009. <br />This packet contains the Annual Report Maps, and the Annual <br />Fee check for $791.00. <br />Respectfully Submitted, <br />Whitewater Building Materials Corp. <br />Mark Gardner <br />Vice President
The URL can be used to link to this page
Your browser does not support the video tag.