Laserfiche WebLink
TR-78: Technical Revision was received on 24 December 2008, called complete on 5 January <br />2009 and is still under consideration by the Division. TR-78 proposes to add sediment control <br />structures in the Prospect Pond Drainage of the East Pit. <br />TR-79: Technical Revision was received on 4 February 2009, called incomplete on 13 February <br />2009, called complete on 23 February 2009 and approved on 22 April 2009. TR-79 updated the <br />spoil grading plan in the West Pit. <br />TR-80: Technical Revision was received on 1 April 2009, called complete on 9 April 2009 and <br />was approved on 16 June 2009. TR-80 updates the East Pit spoil grading plan. <br />3.1.6 Status of Minor Revisions <br />TU.S scctlon lde- llcs Minor ' visions 'IV1Rf processed since the linkil of Renewal 1?l Ulilber <br />4, 22 October 2002. <br />MR-60: Minor Revision 60 was received on 2 June 2003, called complete on 9 June 2003 and <br />approved on 9 June 2003. MR-60 modified to the topsoil stripping schedule. <br />MR-61: Minor Revision 61 was received on 26 November 2003, called complete on 26 <br />November 2003 and approved on 1 January 2004. MR-61 revised the blasting record document <br />and monitoring procedures. <br />MR-62: Minor Revision 62 was received on 12 April 2004, called complete on 13 April 2004 <br />and approved on 13 April 2004. MR-62 revised the permit to expand two topsoil stockpiles and <br />add a power line. <br />MR-63: Minor Revision 63 was received on 14 June 2004, called complete on 21 June 2004 and <br />approved on 21 June 2004. MR-63 revised to the blast record form. <br />MR-64: Minor Revision 64 was received on 29 June 2004, called complete on 29 June 2004 and <br />approved on 1 July 2004. MR-64 approved the installation of a water line and power corridor <br />from the facilities area to the highwall miner. <br />MR-65: Minor Revision 65 was received on 9 July 2004, called complete on 14 July 2004 and <br />approved on 14 July 2004. MR-65 dealt with the inadvertent mining of unleased federal coal in <br />Section 4, T3N R93W. <br />MR-66: Minor Revision 66 was received on 21 October 2004, called complete on 21 October <br />2004 and approved on 21 October 2004. MR-66 approved the relocation of a substation and <br />rock crusher. <br />MR-67: Minor Revision 67 was received on 10 November 2004, called complete on 15 <br />November 2004 and approved on 15 November 2004. MR-67 approved the inclusion of an as- <br />Proposed Decision and Findings of Compliance 14 September 2009 <br />Permit Renewal 05 Page 14