My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-14_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2009-09-14_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:24 PM
Creation date
9/16/2009 1:36:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/14/2009
Doc Name
Proposed Decision & Findings of Compliance for RN5
Permit Index Doc Type
Findings
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-67: Technical Revision 67 was received on 23 August 2007, called complete on 4 <br />September 2007 and approved on 7 September 2007. TR-67 reduced the approved permit <br />boundary by 546.1 acres. <br />TR-68: Technical Revision was received on 5 September 2007, called complete on 17 <br />September 2007 and approved on 18 December 2007. IFR-68 approved designs for a small area <br />exemption for sediment control. <br />TR-69: Technical Revision was received on 22 January 2008, called complete on 1 February <br />2008 and approved on 29 May 2008. TR-69 was an update to the South Taylor Pit mine plan. <br />TR-70: Technical Revision was received on 7 March 2008, called complete on 14 March 2008 <br />and approved on 29 May 2008. TR-70 revised the hydrologic monitoring plan in response to <br />Stipulation 5, from the Permit Revision 02 approval. <br />TR-71: Technical Revision was received on 2 April 2008, called complete on 10 April 2008 and <br />approved on 20 August 2008. TR-71 provided designs t:or the extension of the Section 16 Pond <br />ditch. <br />TR-72: Technical Revision was received on 14 March 2008, called complete on 21 March 2008 <br />and approved on 24 June 2009. TR-72 is a revised reclamation plan and vegetation success <br />criteria for the East Pit, West Pit and South Taylor Pit. Several issues remain outstanding with <br />the reclamation plan, resulting in Stipulations 12 and 13 to the Colowyo permit. <br />TR-73: Technical Revision was received on 5 May 2008, called complete on 13 May 2008 and <br />approved on 23 June 2009. TR-73 updated hydrologic curve numbers for SEDCAD designs for <br />the site. <br />TR-74: Technical Revision was received on 10 July 2008, called complete on 18 July 2008 and <br />approved on 2 March 2009. TR-74 provided as-built maps, designs and reports for the Section <br />28 and West Taylor Ponds. <br />TR-75: Technical Revision was received on 30 July 2008, called incomplete on 6 August 2008, <br />called complete on 5 September 2008 and approved on 30 September 2008. TR-75 approved the <br />redesign of the Section 28 and Section 29 collection ditches in the South Taylor Pit area. <br />TR-76: Technical Revision was received on 12 February 2009, called complete on 23 February <br />2009 and approved on 13 August 2009. TR-76 approved a new South Taylor haul road on the <br />west side of the mine. <br />TR-77: Technical Revision was received on 9 December 2008, called incomplete on 19 <br />December 2008, called complete on 30 January 2009 and approved on 30 March 2009. TR-77 <br />approved highwall mining in portions of the South Taylor Pit. <br />Proposed Decision and Findings of Compliance 14 September 2009 <br />Permit Renewal 05 Page 13
The URL can be used to link to this page
Your browser does not support the video tag.